PROJECTS

01| Chavonne village restoration plan
     

The Chavonne ex-industrial area is part of the Villeneuve town (not so far from Aosta) and it is property of the Regional Council.

The purpose of the restoration is to provide new functionalities to the old buildings so that they may be used for activities such as manifacture, production facilities and the construction of a new multi-purpose centre.

To reach this target some of the buildings were refurbished or renovated, while others were built a new using the original style of the area so as not to create contrasts between the old and the new buildings

03|Degree thesis: "solar collectors in
     architecture"
   

Usually, the installation of Solar Collectors in buildings is left to technicians. Unfortunately this solution tends to be not esthetically pleasing and also can add considerable weight to a structure.

The first part of this thesis is a description of solar collector technology and a study of some good examples of integration into building in Europe.

The second part concerns the use of solar modules for integration into houses belonging to or produced by A.T.C Turin

 

Project |02

 

Project |03

 

Project |01

 

04| Renders
   

The main programs used were:

  • autocad

  • sketchup

  • photoshop (post-production)

 

Project |04

 

Project |05

 

05| Contest of Architectural Ideas for 
      bio-architecture houses in Itri (Latina)
  

The request of the competition was to design some private houses for a land lot using active and passive bio architecture technologies.

Here are the steps followed:

  • contest analysis (zoning, building near the area,    traffic, sunlight);

  • selection of passive techniques (wall surface,  orientation, solar greenhouse, meteoric water reuse);

  • selection of active techniques (solar panels and  collector);

  • housing unit proposal.

 

Realized in collaboration with:

Arch. Elisa Dorigo

 

 

06| Excavated material and waste
      management strategy
   

A synthesis and case study of the excavated material and waste management strategy was produced, according Italian law.

Project |06

 

02| Energetic regeneration hypothesis of
      Arata Isozaki Bjornson studio
   

The aim of the project was to consider an existing building of a famous architect and readapt it following two principals canons:

• modify the building to meet Italian architectural

   standards.

• introduce energy saving technologies